Find out information on transfer station closures.
The Murrumbateman Road intersection includes two sections of segment 35; Stage 1 is 550m and Stage 2 is 440m (plan below). This work will provide an improved road surface, improve the serviceability of the road, and improve safety.
The scope of works includes minor culvert extensions, formation widening, subgrade stabilization, the construction of a new flexible road pavement, bitumen sealing, and line signs.